Search by keyword: "reliability"
Motives and will of the supreme power in Russia in appeals to the people about the war
| Authors: Pavlov S.B. | Published: 07.05.2024 |
| Published in issue: #2(106)/2024 | |
| DOI: 10.18698/2306-8477-2024-2-896 | |
| Category: Noname | |
| Keywords: reliability, theory, determinant, tsar, will, monarchy, actor, God, mood, victory, defeat | |
A study on the essence of risk and properties of a risky situation
| Authors: Gubanov N.N., Gubanov N.I., Cheremnykh L.G. | Published: 13.10.2017 |
| Published in issue: #11(61)/2017 | |
| DOI: 10.18698/2306-8477-2017-11-483 | |
| Category: The Humanities in Technical University | Chapter: Philosophy Science | |
| Keywords: risk, types of risk, risk threshold, risk level, inevitability of risk, danger, reliability | |
Basic model of life cycle costing of the power equipment
| Authors: Brom A.E., Belova O.V., Sissinyo A. | Published: 07.11.2013 |
| Published in issue: #10(12)/2013 | |
| DOI: 10.18698/2306-8477-2013-10-115 | |
| Category: Economic and legal problems of engineering education | Chapter: Economics | |
| Keywords: life cycle costing, power equipment, PLM-strategy, reliability, non-failure operation, acquisition and possession expenses, maintenance | |
Logistic support of operation of difficult and special technical equipment
| Authors: Semushkin D.A. | Published: 07.11.2013 |
| Published in issue: #10(12)/2013 | |
| DOI: 10.18698/2306-8477-2013-10-112 | |
| Category: Economic and legal problems of engineering education | Chapter: Economics | |
| Keywords: logistic support, operation, reliability, maintenance, working capacity restoration, imitating model | |
Specifics of the integrated logistic support of object of space equipment on the example of the space satellite "Sail MGTU"
| Authors: Brom A.E., Evstifeeva N.V., Mayorova V.I., Rachkin D.A. | Published: 07.11.2013 |
| Published in issue: #10(12)/2013 | |
| DOI: 10.18698/2306-8477-2013-10-111 | |
| Category: Economic and legal problems of engineering education | Chapter: Economics | |
| Keywords: the integrated logistic support, space equipment, space satellite, reliability, nonfailure operation, analysis of types and consequences of refusals, electroradioproducts, choice of the supplier, schedule of purchases | |
